Requirements (Click to download)
- For New Building with COO (within 1 year of issuance)
- For old Building with Main Circuit Breaker Above 200 Amperes
- For Old Buildings with Main Circuit Breaker Below 200 Amperes
- For Solar Power Net Metering
- For Temporary Service Connection (On-going Construction with Building Permit)
- For Temporary Service Connection (Informal Settler Families)